|
| |
|
 |
Memorial Timeline Facts
- Committee was formed in 1997
- George Parker, Bob Thurman and Frank Treadway, as
a special committee, provided the memorial design
- Site was chosen in 1998
- Construction begun in 1998
- First ceremony in 1999
- Granite monolith and other granite pieces placed in
1999-2000
- Official dedication in 2000
- Two ceremonies per year, Memorial Day and Veterans Day
- As of 2008 more than 2000 bricks dedicated
|
The original design for the
memorial was done by a local architect, George Parker. As shown in the
original drawing above the brick pavers area is capable of being expanded
beyond the current boundaries.
|
|